The finished labor standard. It's the time a 100% worker should take per unit including all allowances — the number that goes into your staffing model, productivity reports, and engineered standards.
Std Time = Normal Time × (1 + Allowance%)
Full worked example — Stow
Observed Time
0.3500 min
Rating Factor
110%
Normal Time (0.35 × 1.10)
0.3850 min
Allowance Factor
15%
Std Time (0.3850 × 1.15)
0.4428 min
Units per hour at standard
135 u/hr
Expected per 8-hr shift
1,083 units
This is what you report to operations as the Stow standard. Every worker's productivity is measured against it.